Connect with us

Economy

Nigeria’s First Ever Electric Powered Light Train Ready for Inauguration in Calabar

Published

on

​A multi-billion Naira Calabar Light rail project with a cruising speed of about 40 kilometres per hour, is set to be commissioned in Cross River. The Nigerian Television Authoruty (NTA) has reported that the multi-billion Naira Calabar Light rail project, the first in Nigeria, would soon be inaugurated by President Muhammadu Buhari.

The 12-car monorail system, when fully operational, would use an Intamin P8 electric powered passenger shuttle train to convey passengers from Tinapa Resort, across Lake Tinapa to Calabar International Conference Centre (CICC).

Built by Ponet TFZE, the train with a cruising speed of about 40 kilometres per hour, has 12 cars, including 10 passenger and two equipment cars. The monorail would also allow access to Studio Tinapa, Tinapa Shopping Centre and Tinapa waterpark as well as provide a quick alternative access to Summit Hills.

Each car is primed for seven to eight passengers all seated, while the train’s length, width and height are approximately 38, 1.95 and 2.2 metres, respectively. Gov. Ben Ayade had recently told journalists in Calabar that Buhari would inaugurate the train to mark his first year in office.

Mba Mba, the station’s Electrical Engineer, said the light rail project was completed in December last year. “Right now, the Calabar Monorail is ready for use pending inauguration by appropriate authorities.

“We have test-run the system and confirmed its readiness. Gov. Ben Ayade was here with his team to see for himself what is on ground. Tourists troop here on daily basis to take a ride. But they were disappointed as they were turned back,” he said.

The light rail project has three stations, Tinapa, Tinapa Lakeside Hotel and the Calabar International Conference Centre.

Follow us on social media:
Advertisement
Comments

Trending

?>